The lead piece of pipe may be tapered inward as necessary, with longitudinal cuts 3” to 4” long every 6 inches to facilitate the slip lining process. Also, tracks may be added to the bottom of the host pipe to facilitate the slip lining process. The InfraSteel liner is then pushed or pulled into place.